{"id":264737,"date":"2023-09-29T13:09:15","date_gmt":"2023-09-29T13:09:15","guid":{"rendered":"https:\/\/www.evearly.news\/en\/bmw-invests-e100-million-into-new-battery-center\/"},"modified":"2024-01-21T01:09:10","modified_gmt":"2024-01-21T01:09:10","slug":"bmw-invests-e100-million-into-new-battery-center","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/bmw-invests-e100-million-into-new-battery-center\/","title":{"rendered":"BMW invests \u20ac100 million into new battery center"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/st.arenaev.com\/news\/23\/09\/bmw-injects-euro-100-million-into-new-battery-testing-center\/-1242x621\/arenaev_001.jpg\" alt=\"ArenaEV\"><br \/> BMW is navigating the road to electric ubiquity with a \u20ac100 million investment in a novel battery testing center at its Wackersdorf site in Upper Palatinate, Germany. Scheduled for integration into the existing structures, the facility is slated for operation commencement by mid-2024. The investment earmarked for the project is designated primarily towards test bench technology and upgrades to the existing infrastructure. Structural modifications are already in the pipeline, including the installation of a new floor slab for the building. Once operational, the center will host an&#8230; <a href=\"https:\/\/www.arenaev.com\/bmw_injects_100_million_into_new_battery_testing_center-news-2490.php\" target='blank' rel=\"noopener\">More&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/st.arenaev.com\/news\/23\/09\/bmw-injects-euro-100-million-into-new-battery-testing-center\/-1242x621\/arenaev_001.jpg\" alt=\"ArenaEV\"><br \/> BMW is navigating the road to electric ubiquity with a \u20ac100 million investment in a novel battery testing center at its Wackersdorf site in Upper Palatinate, Germany. Scheduled for integration into the existing structures, the facility is slated for operation commencement by mid-2024.<\/p>\n<p>The investment earmarked for the project is designated primarily towards test bench technology and upgrades to the existing infrastructure. Structural modifications are already in the pipeline, including the installation of a new floor slab for the building.<\/p>\n<p>Once operational, the center will host an&#8230; <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/bmw-invests-e100-million-into-new-battery-center\/\"><\/a><\/p>\n","protected":false},"author":27,"featured_media":264738,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[],"class_list":["post-264737","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-arenaev"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/264737","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=264737"}],"version-history":[{"count":1,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/264737\/revisions"}],"predecessor-version":[{"id":281612,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/264737\/revisions\/281612"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/264738"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=264737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=264737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=264737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}