{"id":280661,"date":"2024-01-16T20:37:53","date_gmt":"2024-01-16T20:37:53","guid":{"rendered":"https:\/\/www.evearly.news\/en\/costco-warehouse-installs-off-grid-solar-to-power-its-ev-fleet\/"},"modified":"2024-01-16T20:37:53","modified_gmt":"2024-01-16T20:37:53","slug":"costco-warehouse-installs-off-grid-solar-to-power-its-ev-fleet","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/costco-warehouse-installs-off-grid-solar-to-power-its-ev-fleet\/","title":{"rendered":"Costco warehouse installs off-grid solar to power its EV fleet"},"content":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/01\/costco-warehouse-installs-off-grid-solar-to-power-its-ev-fleet.jpg' alt='' ><br \/>Retail giant Costco has installed on-site solar generation at a new electric truck charging project in southern California. Costco contracted Washington-based Trinity Structures to design and build an off-grid rooftop solar system at its distribution center in Mira Loma. Trinity completed the project in four months. The \u201csolar electrification structure,\u201d as Trinity calls it, is&#8230;   <a href=\"https:\/\/chargedevs.com\/newswire\/costco-warehouse-installs-off-grid-solar-to-power-its-ev-fleet\/\" target=\"bwindow\" rel=\"noopener\">Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/01\/costco-warehouse-installs-off-grid-solar-to-power-its-ev-fleet.jpg' alt=''><br \/>Retail giant Costco has installed on-site solar generation at a new electric truck charging project in southern California. Costco contracted Washington-based Trinity Structures to design and build an off-grid rooftop solar system at its distribution center in Mira Loma. Trinity completed the project in four months. The \u201csolar electrification structure,\u201d as Trinity calls it, is&#8230;  <\/p>\n<p> <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/costco-warehouse-installs-off-grid-solar-to-power-its-ev-fleet\/\"><\/a><\/p>\n","protected":false},"author":28,"featured_media":280662,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-280661","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-charged-evs"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/280661","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=280661"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/280661\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/280662"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=280661"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=280661"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=280661"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}