{"id":286986,"date":"2024-03-18T20:06:19","date_gmt":"2024-03-18T20:06:19","guid":{"rendered":"https:\/\/www.evearly.news\/en\/bp-pulse-to-build-heavy-duty-ev-charging-hub-at-major-truck-stop-near-dover-england\/"},"modified":"2024-03-18T20:06:19","modified_gmt":"2024-03-18T20:06:19","slug":"bp-pulse-to-build-heavy-duty-ev-charging-hub-at-major-truck-stop-near-dover-england","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/bp-pulse-to-build-heavy-duty-ev-charging-hub-at-major-truck-stop-near-dover-england\/","title":{"rendered":"bp pulse to build heavy-duty EV charging hub at major truck stop near Dover, England"},"content":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/03\/bp-pulse-to-build-heavy-duty-ev-charging-hub-at-major-truck-stop-near-dover-england.jpg' alt='' ><br \/>Whatever you and I may think about oil companies moving into the EV charging space, it\u2019s happening. bp pulse plans to build a heavy-duty EV charging hub at an enormous truck stop in England, as part of a strategy to create a Europe-wide network of electric truck charging infrastructure. The Ashford International Truckstop could hardly&#8230;   <a href=\"https:\/\/chargedevs.com\/newswire\/bp-pulse-to-build-heavy-duty-ev-charging-hub-at-major-truck-stop-near-dover-england\/\" target=\"bwindow\" rel=\"noopener\">Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/03\/bp-pulse-to-build-heavy-duty-ev-charging-hub-at-major-truck-stop-near-dover-england.jpg' alt=''><br \/>Whatever you and I may think about oil companies moving into the EV charging space, it\u2019s happening. bp pulse plans to build a heavy-duty EV charging hub at an enormous truck stop in England, as part of a strategy to create a Europe-wide network of electric truck charging infrastructure. The Ashford International Truckstop could hardly&#8230;  <\/p>\n<p> <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/bp-pulse-to-build-heavy-duty-ev-charging-hub-at-major-truck-stop-near-dover-england\/\"><\/a><\/p>\n","protected":false},"author":28,"featured_media":286987,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-286986","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-charged-evs"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/286986","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=286986"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/286986\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/286987"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=286986"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=286986"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=286986"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}