{"id":288440,"date":"2024-04-03T13:08:27","date_gmt":"2024-04-03T13:08:27","guid":{"rendered":"https:\/\/www.evearly.news\/en\/bmw-kicks-off-construction-work-at-the-battery-assembly-plant-in-straskirchen\/"},"modified":"2024-04-03T13:08:27","modified_gmt":"2024-04-03T13:08:27","slug":"bmw-kicks-off-construction-work-at-the-battery-assembly-plant-in-straskirchen","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/bmw-kicks-off-construction-work-at-the-battery-assembly-plant-in-straskirchen\/","title":{"rendered":"BMW kicks off construction work at the battery assembly plant in Stra\u00dfkirchen"},"content":{"rendered":"<p><img src=\"https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/04\/bmw-kicks-off-construction-work-at-the-battery-assembly-plant-in-straskirchen.jpg\" class=\"attachment-large size-large\" alt=\"\" decoding=\"async\" fetchpriority=\"high\" \/><br \/>On Wednesday, the first excavators moved into gear on the construction site of BMW&#8217;s new battery assembly plant in Stra\u00dfkirchen, Germany. According to a German media report, the manufacturer had submitted an application to the local district office for an early start of construction, which was approved last week. <a href=\"https:\/\/www.electrive.com\/2024\/04\/03\/bmw-kicks-off-construction-work-at-the-battery-assembly-plant-in-straskirchen\/\" target='_blank' rel=\"noopener\">Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>src=&#8221;https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/04\/bmw-kicks-off-construction-work-at-the-battery-assembly-plant-in-straskirchen.jpg&#8221; class=&#8221;attachment-large size-large&#8221; alt=&#8221;&#8221; decoding=&#8221;async&#8221; fetchpriority=&#8221;high&#8221; \/&gt;On Wednesday, the first excavators moved into gear on the construction site of BMW&#8217;s new battery assembly plant in Stra\u00dfkirchen, Germany. According to a German media report, the manufacturer had submitted an application to the local district office for an early start of construction, which&#8230; <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/bmw-kicks-off-construction-work-at-the-battery-assembly-plant-in-straskirchen\/\"><\/a><\/p>\n","protected":false},"author":24,"featured_media":288441,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-288440","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrive"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/288440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=288440"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/288440\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/288441"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=288440"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=288440"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=288440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}