{"id":291137,"date":"2024-05-02T02:09:41","date_gmt":"2024-05-02T02:09:41","guid":{"rendered":"https:\/\/www.evearly.news\/en\/asahi-kasei-to-build-li-ion-battery-separator-plant-in-canada\/"},"modified":"2024-05-02T02:09:41","modified_gmt":"2024-05-02T02:09:41","slug":"asahi-kasei-to-build-li-ion-battery-separator-plant-in-canada","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/asahi-kasei-to-build-li-ion-battery-separator-plant-in-canada\/","title":{"rendered":"Asahi Kasei to build Li-ion battery separator plant in Canada"},"content":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/05\/asahi-kasei-to-build-li-ion-battery-separator-plant-in-canada.jpg' alt='' ><br \/>Japanese chemical company Asahi Kasei will construct an integrated plant in Ontario, Canada for the base film manufacturing and coating of its Hipore wet-process lithium-ion battery separator. Asahi Kasei will invest approximately \u00a5180 billion ($1.14 billion) in the facility, which will have a production capacity of around 700 million square meters per year as coated&#8230;   <a href=\"https:\/\/chargedevs.com\/newswire\/asahi-kasei-to-build-li-ion-battery-separator-plant-in-canada\/\" target=\"bwindow\" rel=\"noopener\">Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/05\/asahi-kasei-to-build-li-ion-battery-separator-plant-in-canada.jpg' alt=''><br \/>Japanese chemical company Asahi Kasei will construct an integrated plant in Ontario, Canada for the base film manufacturing and coating of its Hipore wet-process lithium-ion battery separator. Asahi Kasei will invest approximately \u00a5180 billion ($1.14 billion) in the facility, which will have a production capacity of around 700 million square meters per year as coated&#8230;  <\/p>\n<p> <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/asahi-kasei-to-build-li-ion-battery-separator-plant-in-canada\/\"><\/a><\/p>\n","protected":false},"author":28,"featured_media":291138,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-291137","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-charged-evs"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/291137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=291137"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/291137\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/291138"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=291137"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=291137"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=291137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}