{"id":304574,"date":"2024-10-03T15:41:34","date_gmt":"2024-10-03T15:41:34","guid":{"rendered":"https:\/\/www.evearly.news\/en\/j-d-power-satisfaction-with-public-ev-charging-infrastructure-improved-since-2023\/"},"modified":"2024-10-03T15:41:34","modified_gmt":"2024-10-03T15:41:34","slug":"j-d-power-satisfaction-with-public-ev-charging-infrastructure-improved-since-2023","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/j-d-power-satisfaction-with-public-ev-charging-infrastructure-improved-since-2023\/","title":{"rendered":"J.D. Power: satisfaction with public EV charging infrastructure improved since 2023"},"content":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/10\/j-d-power-satisfaction-with-public-ev-charging-infrastructure-improved-since-2023.jpg' alt='' ><br \/>The public EV charging infrastructure in the US improved in the second quarter of the year, after having shown improvement in the first quarter as well, according to research conducted by consumer intelligence firm J.D. Power. The J.D. Power 2024 US Electric Vehicle Experience Public Charging Study, which was released last month, brings a fresh&#8230;   <a href=\"https:\/\/chargedevs.com\/newswire\/j-d-power-satisfaction-with-public-ev-charging-infrastructure-improved-since-2023\/\" target=\"bwindow\" rel=\"noopener\">Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/10\/j-d-power-satisfaction-with-public-ev-charging-infrastructure-improved-since-2023.jpg' alt=''><br \/>The public EV charging infrastructure in the US improved in the second quarter of the year, after having shown improvement in the first quarter as well, according to research conducted by consumer intelligence firm J.D. Power. The J.D. Power 2024 US Electric Vehicle Experience Public Charging Study, which was released last month, brings a fresh&#8230;  <\/p>\n<p> <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/j-d-power-satisfaction-with-public-ev-charging-infrastructure-improved-since-2023\/\"><\/a><\/p>\n","protected":false},"author":28,"featured_media":304575,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-304574","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-charged-evs"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/304574","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=304574"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/304574\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/304575"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=304574"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=304574"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=304574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}