{"id":310322,"date":"2024-12-09T21:12:35","date_gmt":"2024-12-09T21:12:35","guid":{"rendered":"https:\/\/www.evearly.news\/en\/biden-administration-to-loan-rivian-6-6-billion-to-complete-georgia-factory-construction\/"},"modified":"2024-12-09T21:12:35","modified_gmt":"2024-12-09T21:12:35","slug":"biden-administration-to-loan-rivian-6-6-billion-to-complete-georgia-factory-construction","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/biden-administration-to-loan-rivian-6-6-billion-to-complete-georgia-factory-construction\/","title":{"rendered":"Biden Administration to loan Rivian $6.6 billion to complete Georgia factory construction"},"content":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/12\/biden-administration-to-loan-rivian-6-6-billion-to-complete-georgia-factory-construction.jpg' alt='' ><br \/>The US Department of Energy will make a $6.6-billion loan available to California-based Rivian Automotive to allow the startup EV maker to complete the construction of a factory in Georgia. Construction of the $5-billion battery and assembly plant, which was first announced in 2021 and which is 40 miles east of Atlanta, was paused in&#8230;   <a href=https:\/\/chargedevs.com\/newswire\/biden-administration-to-loan-rivian-6-6-billion-to-complete-georgia-factory-construction\/ target=bwindow>Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2024\/12\/biden-administration-to-loan-rivian-6-6-billion-to-complete-georgia-factory-construction.jpg' alt=''><br \/>The US Department of Energy will make a $6.6-billion loan available to California-based Rivian Automotive to allow the startup EV maker to complete the construction of a factory in Georgia. Construction of the $5-billion battery and assembly plant, which was first announced in 2021 and which is 40 miles east of Atlanta, was paused in&#8230;  <\/p>\n<p> <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/biden-administration-to-loan-rivian-6-6-billion-to-complete-georgia-factory-construction\/\"><\/a><\/p>\n","protected":false},"author":28,"featured_media":310323,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-310322","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-charged-evs"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/310322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=310322"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/310322\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/310323"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=310322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=310322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=310322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}