{"id":319894,"date":"2025-04-16T20:14:12","date_gmt":"2025-04-16T20:14:12","guid":{"rendered":"https:\/\/www.evearly.news\/en\/finnish-minerals-and-beijing-easpring-begin-construction-of-a-cathode-material-plant-in-finland\/"},"modified":"2025-04-16T20:14:12","modified_gmt":"2025-04-16T20:14:12","slug":"finnish-minerals-and-beijing-easpring-begin-construction-of-a-cathode-material-plant-in-finland","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/finnish-minerals-and-beijing-easpring-begin-construction-of-a-cathode-material-plant-in-finland\/","title":{"rendered":"Finnish Minerals and Beijing Easpring begin construction of a cathode material plant in Finland"},"content":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/04\/finnish-minerals-and-beijing-easpring-begin-construction-of-a-cathode-material-plant-in-finland.jpg' alt='' ><br \/>Finnish Minerals and Chinese battery materials producer Beijing Easpring Material Technology have started construction of a plant in Kotka, Finland to produce cathode active material (CAM) for lithium-ion batteries. The plant\u2019s first-stage capacity will be 60,000 tons of CAM per year. The plan targets commercial production in 2027 and includes the possibility of expanding production&#8230;   <a href=https:\/\/chargedevs.com\/newswire\/finnish-minerals-and-beijing-easpring-begin-construction-of-a-cathode-material-plant-in-finland\/ target=bwindow>Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/04\/finnish-minerals-and-beijing-easpring-begin-construction-of-a-cathode-material-plant-in-finland.jpg' alt=''><br \/>Finnish Minerals and Chinese battery materials producer Beijing Easpring Material Technology have started construction of a plant in Kotka, Finland to produce cathode active material (CAM) for lithium-ion batteries. The plant\u2019s first-stage capacity will be 60,000 tons of CAM per year. The plan targets commercial production in 2027 and includes the possibility of expanding production&#8230;  <\/p>\n<p> <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/finnish-minerals-and-beijing-easpring-begin-construction-of-a-cathode-material-plant-in-finland\/\"><\/a><\/p>\n","protected":false},"author":28,"featured_media":319895,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-319894","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-charged-evs"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/319894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=319894"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/319894\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/319895"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=319894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=319894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=319894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}