{"id":328898,"date":"2025-07-19T13:18:11","date_gmt":"2025-07-19T13:18:11","guid":{"rendered":"https:\/\/www.evearly.news\/en\/first-motorway-charging-park-from-fastned-in-the-german-network-in-operation\/"},"modified":"2025-07-19T13:18:11","modified_gmt":"2025-07-19T13:18:11","slug":"first-motorway-charging-park-from-fastned-in-the-german-network-in-operation","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/first-motorway-charging-park-from-fastned-in-the-german-network-in-operation\/","title":{"rendered":"First motorway charging park from Fastned in the German network in operation"},"content":{"rendered":"<p><img src=\"https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/07\/first-motorway-charging-park-from-fastned-in-the-german-network-in-operation.jpg\" class=\"attachment-large size-large\" alt=\"\" decoding=\"async\" fetchpriority=\"high\" loading=\"eager\" \/><br \/>Fastned has opened its first fast-charging location directly on a motorway as part of the German network. At the Neufelder Heide-S\u00fcd service area on the A40 motorway, three covered fast-charging stations with a capacity of up to 400 kW each are now available. <a href=https:\/\/www.electrive.com\/2025\/07\/18\/first-motorway-charging-park-from-fastned-in-the-german-network-in-operation\/ target='_blank'>Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>src=&#8221;https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/07\/first-motorway-charging-park-from-fastned-in-the-german-network-in-operation.jpg&#8221; class=&#8221;attachment-large size-large&#8221; alt=&#8221;&#8221; decoding=&#8221;async&#8221; fetchpriority=&#8221;high&#8221; loading=&#8221;eager&#8221; \/&gt;Fastned has opened its first fast-charging location directly on a motorway as part of the German network. At the Neufelder Heide-S\u00fcd service area on the A40 motorway, three covered fast-charging stations with a capacity of up to 400 kW each are now available&#8230;. <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/first-motorway-charging-park-from-fastned-in-the-german-network-in-operation\/\"><\/a><\/p>\n","protected":false},"author":24,"featured_media":328899,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-328898","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrive"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/328898","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=328898"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/328898\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/328899"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=328898"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=328898"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=328898"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}