{"id":330301,"date":"2025-08-05T14:10:43","date_gmt":"2025-08-05T14:10:43","guid":{"rendered":"https:\/\/www.evearly.news\/en\/new-mexico-launches-school-bus-electrification-pilot-project-with-greenpower-motor\/"},"modified":"2025-08-05T14:10:43","modified_gmt":"2025-08-05T14:10:43","slug":"new-mexico-launches-school-bus-electrification-pilot-project-with-greenpower-motor","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/new-mexico-launches-school-bus-electrification-pilot-project-with-greenpower-motor\/","title":{"rendered":"New Mexico launches school bus electrification pilot project with GreenPower Motor"},"content":{"rendered":"<p><img src=\"https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/08\/new-mexico-launches-school-bus-electrification-pilot-project-with-greenpower-motor.png\" class=\"attachment-large size-large\" alt=\"\" decoding=\"async\" fetchpriority=\"high\" loading=\"eager\" \/><br \/>The electric bus manufacturer GreenPower Motor has signed a contract with the state of New Mexico to run an all-electric school bus pilot project. It is to run over two years and will serve to evaluate routes and the required charging infrastructure. <a href=https:\/\/www.electrive.com\/2025\/08\/05\/new-mexico-to-electrify-school-bus-fleet-with-greenpower-motor\/ target='_blank'>Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>src=&#8221;https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/08\/new-mexico-launches-school-bus-electrification-pilot-project-with-greenpower-motor.png&#8221; class=&#8221;attachment-large size-large&#8221; alt=&#8221;&#8221; decoding=&#8221;async&#8221; fetchpriority=&#8221;high&#8221; loading=&#8221;eager&#8221; \/&gt;The electric bus manufacturer GreenPower Motor has signed a contract with the state of New Mexico to run an all-electric school bus pilot project. It is to run over two years and will serve to evaluate routes and the required charging infrastructure&#8230;. <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/new-mexico-launches-school-bus-electrification-pilot-project-with-greenpower-motor\/\"><\/a><\/p>\n","protected":false},"author":24,"featured_media":330302,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-330301","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrive"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/330301","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=330301"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/330301\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/330302"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=330301"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=330301"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=330301"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}