{"id":331474,"date":"2025-08-18T14:43:55","date_gmt":"2025-08-18T14:43:55","guid":{"rendered":"https:\/\/www.evearly.news\/en\/tellus-power-wins-funding-for-33-ev-charging-sites-in-californias-second-round-of-nevi-program-funding\/"},"modified":"2025-08-18T14:43:55","modified_gmt":"2025-08-18T14:43:55","slug":"tellus-power-wins-funding-for-33-ev-charging-sites-in-californias-second-round-of-nevi-program-funding","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/tellus-power-wins-funding-for-33-ev-charging-sites-in-californias-second-round-of-nevi-program-funding\/","title":{"rendered":"Tellus Power wins funding for 33 EV charging sites in California\u2019s second round of NEVI program funding"},"content":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/08\/tellus-power-wins-funding-for-33-ev-charging-sites-in-californias-second-round-of-nevi-program-funding.jpg' alt='' ><br \/>Tellus Power builds EV chargers in California. The company offers DC fast chargers in 180 kW and 360 kW versions, with a choice of CCS, CHAdeMO and\/or NACS connectors. The company has just announced a big win in its home state. In July, the California Energy Commission proposed $36.88 million in awards in the state\u2019s&#8230;   <a href=https:\/\/chargedevs.com\/newswire\/tellus-power-wins-funding-for-33-ev-charging-sites-in-californias-second-round-of-nevi-program-funding\/ target=bwindow>Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/08\/tellus-power-wins-funding-for-33-ev-charging-sites-in-californias-second-round-of-nevi-program-funding.jpg' alt=''><br \/>Tellus Power builds EV chargers in California. The company offers DC fast chargers in 180 kW and 360 kW versions, with a choice of CCS, CHAdeMO and\/or NACS connectors. The company has just announced a big win in its home state. In July, the California Energy Commission proposed $36.88 million in awards in the state\u2019s&#8230;  <\/p>\n<p> <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/tellus-power-wins-funding-for-33-ev-charging-sites-in-californias-second-round-of-nevi-program-funding\/\"><\/a><\/p>\n","protected":false},"author":28,"featured_media":331475,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-331474","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-charged-evs"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/331474","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=331474"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/331474\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/331475"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=331474"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=331474"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=331474"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}