{"id":335203,"date":"2025-10-01T20:13:57","date_gmt":"2025-10-01T20:13:57","guid":{"rendered":"https:\/\/www.evearly.news\/en\/autel-energy-opens-us-orders-for-its-ev-charging-battery-storage-systems\/"},"modified":"2025-10-01T20:13:57","modified_gmt":"2025-10-01T20:13:57","slug":"autel-energy-opens-us-orders-for-its-ev-charging-battery-storage-systems","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/autel-energy-opens-us-orders-for-its-ev-charging-battery-storage-systems\/","title":{"rendered":"Autel Energy opens US orders for its EV charging\/battery storage systems"},"content":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/10\/autel-energy-opens-us-orders-for-its-ev-charging-battery-storage-systems.jpg' alt='' ><br \/>EV charging provider Autel Energy has deployed an integrated EV charging and battery energy storage system (BESS) at its manufacturing facility in Greensboro, North Carolina. This installation, the company\u2019s first completed project in the US, showcases the scalability of its integrated design and deployment model. The site features a 250 kWh battery cabinet paired with&#8230;   <a href=https:\/\/chargedevs.com\/newswire\/autel-energy-opens-us-orders-for-its-ev-charging-battery-storage-systems\/ target=bwindow>Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><img src='https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2025\/10\/autel-energy-opens-us-orders-for-its-ev-charging-battery-storage-systems.jpg' alt=''><br \/>EV charging provider Autel Energy has deployed an integrated EV charging and battery energy storage system (BESS) at its manufacturing facility in Greensboro, North Carolina. This installation, the company\u2019s first completed project in the US, showcases the scalability of its integrated design and deployment model. The site features a 250 kWh battery cabinet paired with&#8230;  <\/p>\n<p> <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/autel-energy-opens-us-orders-for-its-ev-charging-battery-storage-systems\/\"><\/a><\/p>\n","protected":false},"author":28,"featured_media":335204,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-335203","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-charged-evs"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/335203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=335203"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/335203\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/335204"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=335203"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=335203"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=335203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}