{"id":348560,"date":"2026-03-13T19:32:35","date_gmt":"2026-03-13T19:32:35","guid":{"rendered":"https:\/\/www.evearly.news\/en\/thunderplus-to-build-1-6-mw-charging-hub-in-india\/"},"modified":"2026-03-13T19:32:35","modified_gmt":"2026-03-13T19:32:35","slug":"thunderplus-to-build-1-6-mw-charging-hub-in-india","status":"publish","type":"post","link":"https:\/\/www.evearly.news\/en\/thunderplus-to-build-1-6-mw-charging-hub-in-india\/","title":{"rendered":"ThunderPlus to build 1.6 MW charging hub in India"},"content":{"rendered":"<p><img width=\"1280\" height=\"959\" src=\"https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2026\/03\/thunderplus-to-build-1-6-mw-charging-hub-in-india.jpg\" class=\"attachment-large size-large\" alt=\"Thunderplus x evey trans charging hub tadepalli\" decoding=\"async\" fetchpriority=\"high\" loading=\"eager\" \/><br \/>ThunderPlus, a leading EV charging solutions provider in India, has announced plans to set up a charging hub with a total installed capacity of 1.6 MW. For the project, the company has partnered with EveyTrans, a major electric bus operator, and will hold a 40 per cent ownership stake in the facility. <a href=https:\/\/www.electrive.com\/2026\/03\/13\/thunderplus-to-build-1-6-mw-charging-hub-in-india\/ target='_blank'>Read more&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>width=&#8221;1280&#8243; height=&#8221;959&#8243; src=&#8221;https:\/\/www.evearly.news\/en\/wp-content\/uploads\/sites\/7\/2026\/03\/thunderplus-to-build-1-6-mw-charging-hub-in-india.jpg&#8221; class=&#8221;attachment-large size-large&#8221; alt=&#8221;Thunderplus x evey trans charging hub tadepalli&#8221; decoding=&#8221;async&#8221; fetchpriority=&#8221;high&#8221; loading=&#8221;eager&#8221; \/&gt;ThunderPlus, a leading EV charging solutions provider in India, has announced plans to set up a charging hub with a total installed capacity of 1.6 MW. For the project, the company has partnered with EveyTrans, a&#8230; <a class=\"continue-reading-link\" href=\"https:\/\/www.evearly.news\/en\/thunderplus-to-build-1-6-mw-charging-hub-in-india\/\"><\/a><\/p>\n","protected":false},"author":24,"featured_media":348561,"comment_status":"closed","ping_status":"open","sticky":false,"template":"Default","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-348560","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrive"],"_links":{"self":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/348560","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/comments?post=348560"}],"version-history":[{"count":0,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/posts\/348560\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media\/348561"}],"wp:attachment":[{"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/media?parent=348560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/categories?post=348560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evearly.news\/en\/wp-json\/wp\/v2\/tags?post=348560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}