Rondo Energy and energy producer EDP are installing a massive 100 MWh renewable-powered heat battery at HEINEKEN’s brewery in Lisbon, Portugal. The project will deliver round-the-clock renewable steam and reduce emissions without altering the facility’s beer brewing process. Read more…
HEINEKEN is brewing beer with a massive 100 MWh heat battery
Bookmark the permalink.

