BYD is pushing ahead with the construction of 4,000 1,000-kW flash charging stations, with the first batch of about 500 ready for use in early April.
The 1-MW flash charging can add 400 kilometers of range to a vehicle in five minutes.
BYD’s 1st 1,000-kW ultrafast charging stations to be ready for use in early Apr
Bookmark the permalink.