The facility is CATL’s second European plant besides its German operation, with an annual capacity target of 100 GWh.
CATL unveiled the Shenxing Pro Battery in Europe, the first product featuring its latest NP 3.0 technology.
CATL expects its Hungarian plant to begin production by early 2026
Bookmark the permalink.