Public charging operator EVgo has developed a prefabrication approach to new station installation that it says could halve the average station installation time and deliver substantial savings on station construction costs, while ensuring consistent, high-quality assembly in a controlled environment. The scalable design packages six or more DC fast charging stalls, along with power cabinets… Read more…
Evgo’s prefabricated EV charging stations save installation time, costs
Bookmark the permalink.