• News aggregator on electric cars and electric vehicles (cars, motorcycles, boats, planes).

Pii’s EV chargers are designed for sites without 480 V electrical service


There are two things everyone in the EV industry seems to agree on: (1) we need more charging infrastructure; and (2) installing that infrastructure often takes much too long. The delays very often have to do with getting a site connected to power, but it isn’t (always) the fault of the local utilities—they must contend… Read more…

Bookmark the permalink.

Comments are closed.